Home समाचार Preparation of Connecting The Lights In Main Road of Kathmandu

Preparation of Connecting The Lights In Main Road of Kathmandu

91
0

Kathmandu Metropolitan Municipality has planned plans to provide lightning lights (high-speed) across the main premises.

According to other general lights, the ‘haamas’ provided light to a large area, the Metropolis had started connecting the lights to about 20 chakras that were more than the road.

After connecting the ‘Haamas’ lamp in any corner, the Metropolitan Spokesperson, Godwar Dongol, said that it will spread light around it. He said that in the final phase of construction of detailed project report (Dip) for connecting these lights of light to remote areas.

“The connection of the connection will be started on the basis of the same report,” he said.

Dangol said that the municipality will also arrange budget for connecting Himasas light in the place of Banneshwar, Tripureshwar, Maharajgunj, Koteshwar, Maiti, Chhihil and other places. Study at the height, return, and how to connect while connecting the lamp in Chakachoch.

He said that the ‘Himasas’ lights were new to Nepal because it was a long time for the study. The lamp will be easy for both passengers and drivers to keep the main gate.

The Metropolitan Municipality has connected about 16 thousand light in main and inner roads under the Mayor Lighting Program.

The Metropolitan Municipality has connected the lights to the coordination of VAD offices. (Rasas)

LEAVE A REPLY

Please enter your comment!
Please enter your name here